Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Septic tank

البيارة

A pit or tank collecting wastewater where there is no sewer.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A septic tank collects wastewater from the building where there is no public sewer, emptied periodically by tanker or with a soakaway as the rules allow. Its capacity is designed for the number of users.

Why it matters on a project

Poor construction causes smells and leaks that pollute the soil and the water tank. When a sewer arrives later, the building is connected as the authority requires.

Measurement and pricing

Excavation and concrete in cubic metres or a lump sum per tank, connecting pipes per linear metre.

Common mistake

Building the septic tank close to the water tank or a neighbour's foundations without the required distances.

Frequently asked questions

Does a septic tank need design?

Yes, its size, type and location follow the number of users and municipal rules.

What happens when the sewer arrives?

The building connects to it per the authority's rules, and the old tank is filled or removed.

Related terms

  • Underground water tankA concrete tank below ground for storing drinking water.
  • MEP drawingsElectrical, plumbing, HVAC and fire drawings.
  • ExcavationRemoving soil down to the required foundation level.
  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote