Cooling load

حمل التكييف

The heat the air conditioning must remove from a space.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Cooling load is the total heat entering a space from sun, walls, roof, glazing, people, lighting, equipment and outside air. It is measured in tons of refrigeration or BTU per hour; one ton equals 12,000 BTU/h.

Why it matters on a project

It sizes the units, the ductwork and the electrical load. Guessing it gives rooms that will not cool in August, or oversized units that waste power.

Worked example

A 4 × 5 m room = 20 m² at a rough 18 m² per ton: 20 ÷ 18 = 1.1 tons, about an 18,000 BTU/h unit. The final figure comes from a load calculation, not this rule.

Common mistake

Picking a room unit by floor area alone, ignoring a west facade or an uninsulated top-floor roof.

Frequently asked questions

Is the square metres per ton rule enough?

Only for a first estimate; it varies a lot with a west facade, top-floor roof and glazing ratio.

Who calculates the cooling load?

The mechanical engineer, with load calculation software, as part of the MEP drawings.

Related terms

  • MEP drawingsElectrical, plumbing, HVAC and fire drawings.
  • Thermal insulationMaterials reducing heat transfer through walls and roofs, required by the Saudi Building Code.
  • Double glazingTwo glass panes with an air or gas gap to insulate heat and sound.
  • Electrical load scheduleA table summing each board's loads to size breakers, cables and the meter.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote