Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

BOQ preambles

مقدمة جدول الكميات

The conditions and definitions that state what each rate includes.

Category: Quantities & pricing

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

BOQ preambles come before the items and set the method of measurement, what each unit rate includes (materials, labour, plant, waste, transport and testing), currency, VAT and how unpriced items are treated.

Why it matters on a project

They settle questions such as whether the tiling rate includes adhesive and grout, or whether excavation includes cart away. Leaving them out opens the door to claims.

Common mistake

Pricing items without reading the preambles, missing costs they state are included in the rate.

Frequently asked questions

Are the preambles part of the contract?

Yes when the BOQ is a contract document, and rates are interpreted by them in disputes.

What if preambles conflict with an item description?

The contract's order of precedence decides, usually with the specific description over the general.

Related terms

Read next

Does your project need quantity take-off and BOQ pricing? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote