Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Site hoarding

سور الموقع المؤقت

A fence around the site separating it from the public and stopping entry.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Site hoarding is a barrier of metal sheets or panels on a fixed frame around the site from day one, with controlled gates for plant and workers, at the height and appearance set by the municipality, carrying the project signboard.

Why it matters on a project

It protects passers-by and children from excavations and plant, reduces theft and dust, and its absence leads straight to fines and work stoppage.

Measurement and pricing

In linear metres with gates by number, or within preliminaries as a lump sum.

Common mistake

Leaving gaps in the hoarding for trucks with no gate or watchman, so the public walk in.

Frequently asked questions

Does a villa site need hoarding?

Municipalities usually require it on street-facing sites, with height and look per their rules.

Where does the signboard go?

On the hoarding facing the main street, in a visible position.

Related terms

  • PreliminariesItems at the start of the BOQ covering general site requirements.
  • Site housekeepingKeeping the site tidy and clear of waste and obstructions.
  • ExcavationRemoving soil down to the required foundation level.
  • HSE planThe document setting out how health, safety and environment are managed.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote