Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Facade design

تصميم الواجهات

Designing the building's exterior with materials, openings and shading.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Facade design sets the building's exterior: composition and proportion, materials and colours, opening ratio, shading elements, and cornice and parapet details. In Saudi Arabia it is shaped by the Saudi Architecture guidelines, urban codes and energy requirements.

Why it matters on a project

The facade sets the building's identity and value, and affects indoor heat, cooling cost and maintenance. It can be a large share of external finishing cost.

Measurement and pricing

Facade materials in square metres by type, cornices and sills in linear metres, special elements by number.

Common mistake

Choosing a high glass ratio on west and south facades without shading, raising indoor heat and the electricity bill.

Frequently asked questions

Which facade materials suit the Saudi climate?

Stone, GRC and quality external paints, with shading for west and south openings.

Can the facade change after the permit?

Substantial changes need a permit amendment, especially in cities applying the architecture guidelines.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote