Door and window schedule

جدول الأبواب والنوافذ

A table giving the code, size and specification of every door and window.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

The door and window schedule lists for each door and window its code on the plans, size, leaf, frame and glazing type, opening direction, hardware, fire rating where needed and number of units.

Why it matters on a project

It is the basis for pricing and fabricating doors and windows, which are high-value items. Without it each contractor prices his own assumptions and offers cannot be compared.

Measurement and pricing

Gives the count for each type and size directly, or the area in square metres for windows and facades.

Common mistake

Issuing a schedule that no longer matches the plan codes after revisions, so counts differ between schedule and drawings.

Frequently asked questions

What goes in a door code?

A letter for the type and a serial number, such as D01 for the first door and W03 for the third window.

Is the schedule enough for fabrication?

No, the fabricator needs shop drawings with sections, details and actual site measurements.

Related terms

  • Aluminium windowsWindows with aluminium frames, sliding or hinged, single or double glazed.
  • Timber doorsInternal doors in solid or engineered timber with frame and hardware.
  • Floor planA drawing of a floor as if cut horizontally at about one metre.
  • Quantity take-offExtracting quantities from drawings under defined measurement rules, with a reference for every figure.