Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Soil bearing capacity

قدرة تحمل التربة

The safe pressure the soil can take under a foundation.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Soil bearing capacity is the highest pressure the soil can take under a foundation without shear failure or excess settlement. It comes from the soil investigation report, and the column load is divided by it to size the footing.

Why it matters on a project

It is the first number a structural designer needs. Assuming it without testing can give small footings that settle, or large ones that waste concrete and steel.

Worked example

A 900 kN column on soil of 150 kN/m²: area = 900 ÷ 150 = 6 m², a footing about 2.45 × 2.45 m before adding the footing and backfill weight, which the designer then adds.

Common mistake

Designing villa foundations with a value copied from a neighbouring plot instead of testing the site itself.

Frequently asked questions

Where do I get the bearing capacity?

From the soil investigation report prepared by an accredited lab for the site.

Can I build without a soil test?

It is not advisable, and many authorities require it for the permit.

Related terms

Read next

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote