Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptOffices and workspaces · Riyadh · 2026

Staff Amenity Floor in a Riyadh Office Tower

Interior concept for a staff amenity floor in a Riyadh office tower: a café with communal tables and booths, prayer rooms for men and women with ablution areas, a quiet rest room, a break and games lounge, a staff pantry and a shaded outdoor terrace.

A concept designed by Arab Creators, not a built project.

Staff café Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Prayer room Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Rest room Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Break lounge Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Pantry Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Terrace Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Detail Staff Amenity Floor in a Riyadh Office Tower · Interior concept
Material palette Staff Amenity Floor in a Riyadh Office Tower · Interior concept

Materials and details

  • Terracotta tile
  • Light oak
  • Olive fabric
  • Polished concrete
  • Calm carpet
  • Matte black metal

Design idea

The amenity floor is where staff take their breaks, prayers and coffee. We design it as a comfortable place that makes people want to stay at the office and brings teams from different departments together.

Prayer and ablution

Separate prayer rooms for men and women near washrooms and ablution areas, with the qibla direction set out, easy-clean floors in ablution areas and good ventilation.

Operation

A café and pantry with water, drainage and extract, an acoustically separated rest room, a shaded terrace for mild days, and exits and fire protection to Civil Defense requirements.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Amenity floor film
Amenity floor reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: