Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptCommercial · Riyadh · 2026

Specialty Coffee House

A contemporary specialty coffee house in Riyadh: a sand-plaster pavilion with a glass front, a fluted bar with a travertine top, a seating hall with arched niches, a glass roastery and an outdoor terrace under an oak pergola.

A concept designed by Arab Creators, not a built project.

Front at blue hour Specialty Coffee House · Architectural concept
Espresso bar Specialty Coffee House · Architectural concept
Seating hall Specialty Coffee House · Architectural concept
Window counter Specialty Coffee House · Architectural concept
Roastery and slow bar Specialty Coffee House · Architectural concept
Outdoor terrace Specialty Coffee House · Architectural concept

Materials and details

  • Sand plaster with softly rounded corners
  • Fluted cladding and a honed travertine bar top
  • Natural oak for furniture, shelving and canopy
  • Warm terrazzo floor
  • Slim bronze glazing frames
  • Copper and bronze in lighting and roaster

Design idea

A coffee house in its own pavilion that reads from the street as a warm sand-coloured block with a glass front showing the bar. Inside, the space works in four moods: the bar for order-and-go, the seating hall for friends, the window counter for reading and work, and a glass roastery that makes roasting part of the visit. In the evening the seating moves outside under the pergola.

Suggested spaces

About 180 to 250 m² indoors for 50 to 70 seats, with an outdoor terrace of about 80 to 120 m². A bar at least 6 to 8 m long so one or two baristas can work without crowding, and the roastery in its own room close to the store.

Build and upkeep

The roaster needs its own exhaust flue to roof level, ventilation and fire protection to Civil Defense requirements, and municipal approval for the activity. The travertine bar top is sealed against stains, and the terrazzo floor handles heavy traffic. Outdoor oak is treated for UV and moisture or replaced with composite timber.

How we apply it to your project

We design the coffee house on your actual site and brand identity in a 3D model, then deliver construction drawings, bar details and material and quantity schedules. Our published rates: full interior design 150 SAR per m² and 350 SAR per 3D view, excluding VAT. Details on interior design.

Video

Coffee house film
Coffee house reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: