Architectural conceptHospitality · Historic Jeddah · 2026
Hijazi Boutique Hotel
An eight-storey boutique hotel with 64 rooms and suites in historic Jeddah that recalls the old Jeddah houses while serving today's guest. White coral-stone facades and teak roshans with blue-green frames, an inner courtyard with a pool and palms, a rooftop restaurant, and arcades and cafés at ground level.
A concept designed by Arab Creators, not a built project.
Exterior and site
Interiors
Details
Materials and details
- White coral stone, facades
- Treated teak, roshans and mashrabiyas
- Patterned Hijazi tiles, lobby floors
- Brass lanterns and details
Design idea
The hotel takes the roshan, coral stone and inner courtyard from the old Jeddah houses and puts them at the service of today's guest. The roshan in each room is a real seat over the lane, and the pool courtyard with palms brings calm inside a busy quarter.
Programme
Eight floors with 64 rooms and suites, a lobby, a rooftop restaurant, and cafés and arcades on the lane at ground level. A standard room of about 30 to 35 m², with suites on the upper floors behind double roshans.
Build and upkeep
In historic Jeddah the area regulations and the Hejazi Coast style govern every facade detail, so facades are approved early. Roshans are treated teak that tolerates humidity, and the coral stone can be cladding of suitable thickness on a concrete frame.
How we apply it to your project
We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.
More concepts
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Red Sea Coastal Villa
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
