Architectural conceptRetail · Riyadh · 2026
Najdi Open-Air Souq
An open-air souq on a 45,000 m² site with about 28,000 m² of retail: 180 shops and 35 restaurants and cafés around six shaded squares. Lanes and squares that recall the old quarters of Diriyah and Riyadh, with mud-colour walls, tamarisk timber and fabric shading, run as a modern retail centre.
A concept designed by Arab Creators, not a built project.
Exterior and site
Interiors
Details
Materials and details
- Mud-colour render, walls
- Tamarisk timber and shade fabric, canopies
- Bronze shopfronts
- Local stone paving
Design idea
An open-air souq in the spirit of the old quarters of Diriyah and Riyadh: narrow shaded lanes leading to squares, instead of a closed mall. Shade from walls and timber and fabric canopies makes walking possible most of the year, and the squares host events and seating.
Programme
A 45,000 m² site with about 28,000 m² of retail: 180 shops and 35 restaurants and cafés around six squares. Lanes 6 to 9 m wide, parking in a basement or at the edges, and service and loading routes behind the shops, not in the lanes.
Build and upkeep
Canopies combine tamarisk timber with sun-resistant PTFE or PVC fabric, with misting in summer. Uniform bronze shopfronts keep the character, and cooling, waste and security run centrally like any modern retail centre.
How we apply it to your project
We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.
More concepts
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Red Sea Coastal Villa
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
