Architectural conceptHealthcare · Eastern Province · 2026
Healing Architecture Hospital
A 300-bed general hospital of about 62,000 m² on four to six floors, laid out low around green healing courtyards so every patient sees daylight and a garden. A separate emergency entrance, 40 outpatient clinics and clear circulation that lowers stress for patients and visitors. Light sandstone with horizontal aluminium louvres over the windows.
A concept designed by Arab Creators, not a built project.
Exterior and site
Interiors
Details
Materials and details
- Light sandstone and white panels, facades
- Horizontal aluminium louvres over windows
- Medical vinyl floors in rooms and corridors
- Native trees and planting in the healing courtyards
Design idea
Instead of a tall tower, a low horizontal hospital around green courtyards, because daylight and nature reduce stress and help recovery. Every patient room overlooks a courtyard, and the main corridors are easy to read so visitors do not get lost.
Programme
A 300-bed general hospital of about 62,000 m² on four to six floors, with 40 outpatient clinics and a separate emergency entrance on its own ambulance route. Plant, kitchens and laundry sit in a rear wing away from patient movement.
Build and upkeep
Hospital design follows Ministry of Health and infection control requirements, with medical gases and room pressure regimes. Medical vinyl floors and coved corners make cleaning easier, and horizontal louvres lower the cooling load in the humid Eastern Province climate.
How we apply it to your project
We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.
More concepts
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Red Sea Coastal Villa
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
