Architectural conceptResidential · North Riyadh · 2026
Salmani Residential Tower
A 22-storey residential tower on a four-storey retail podium with about 160 apartments of two to four bedrooms. Light limestone and deep GRC fins shade the glazing from the west and south sun, recessed balconies carry perforated Najdi screens for privacy, and the crown has Najdi openings. Shops and cafés fill the podium, with a pool deck and gym on its roof.
A concept designed by Arab Creators, not a built project.
Exterior and site
Interiors
Details
Materials and details
- Honed beige limestone, facades and podium
- Stone-colour GRC, fins, crown and screens
- Low-E double glazing
- Bronze aluminium frames and railings
- Travertine and walnut in the lobby
Design idea
The Salmani style in a tower: a heavy stone base, a body of deep fins and a crown with Najdi openings. The fins are not decoration; they shade the glazing from the west and south sun, and the recessed balconies with perforated screens give families privacy on the upper floors.
Programme
22 residential floors on a four-storey podium, about 160 apartments of two to four bedrooms. The podium holds shops and cafés, its roof a pool and gym, and parking sits in the basement. A double-height lobby separates residents from visitors.
Build and upkeep
Fins and crown are stone-colour GRC because it is far lighter than real stone at height. The facades need a cleaning system and a roof gondola (BMU) planned from the design stage, and wind loads checked for the fins.
How we apply it to your project
We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.
More concepts
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Red Sea Coastal Villa
- Double-height Living Room
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
