Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptEducation · Riyadh · 2026

International School Campus

A K to 12 school campus for 1,500 students in 60 classrooms, about 24,000 m². Low wings around shaded courtyards that are safe for children and comfortable in the heat, an indoor sports hall and shaded pitch, a library and laboratories in daylight, and a separate bus lane.

A concept designed by Arab Creators, not a built project.

Exterior and site

Entrance at drop-off International School Campus · Architectural concept
Aerial view of the campus International School Campus · Architectural concept
Shaded courtyard International School Campus · Architectural concept

Interiors

Classroom International School Campus · Architectural concept
Library International School Campus · Architectural concept
Laboratory International School Campus · Architectural concept

Materials and details

  • Sandstone facades
  • Coloured aluminium frames and horizontal louvres
  • Fabric shades over courtyards and the pitch
  • Rubber flooring on play areas

Design idea

Low wings around shaded courtyards, because children move between classrooms and play areas all day. Each school stage has its own wing and courtyard, so supervision is easier and ages stay apart, with the library and labs at the heart in daylight.

Programme

K to 12, 1,500 students in 60 classrooms over about 24,000 m². A classroom of about 60 m² for 25 students, an indoor sports hall, a shaded pitch, a multi-purpose theatre, and a bus lane separate from the parents' entrance.

Build and upkeep

Schools follow Ministry of Education and Civil Defence requirements for exits and stairs. Rubber flooring on play areas reduces injuries, fabric shades over the courtyards cut heat a great deal, and horizontal louvres protect classrooms from glare.

How we apply it to your project

We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: