Architectural conceptCommercial · Riyadh business district · 2026
Mashrabiya Lattice Office Tower
A 20-storey office tower on a three-storey podium with about 24,000 m² of lettable offices. A white GRC lattice inspired by the mashrabiya wraps the curtain walls and shades the whole building, cutting the cooling load and giving it a clear identity on the skyline. A triple-height lobby with a carved stone wall and a green wall.
A concept designed by Arab Creators, not a built project.
Exterior and site
Interiors
Details
Materials and details
- White GRC, facade lattice and crown
- Low-E curtain walls behind the lattice
- White terrazzo, lobby floors
- Carved light stone and walnut at reception
Design idea
The mashrabiya lattice is environmental before it is identity: an outer layer that shades the curtain wall, cutting the cooling load and allowing clearer glass inside. On the skyline the tower reads as one white piece, and in the lobby the carved stone carries the same idea.
Programme
20 office floors on a three-storey podium, about 24,000 m² lettable, with open floors and as few internal columns as possible. A triple-height lobby with a green wall, and separate entries for parking and loading.
Build and upkeep
The lattice is precast GRC panels fixed to a steel frame separate from the curtain wall, with a maintenance gap between them. Repeated units from a few moulds keep fabrication cost down, and dust and washing are studied from the start.
How we apply it to your project
We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.
More concepts
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Red Sea Coastal Villa
- Double-height Living Room
- Salmani Residential Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
