Architectural conceptReligious · Riyadh · 2026
Contemporary Najdi Mosque
A neighbourhood mosque for 1,200 worshippers in the main hall and 250 in the women's hall, about 2,600 m². Mud-colour render walls and a Najdi minaret, a tamarisk timber ceiling, and a courtyard and arcade that shade worshippers before and after prayer, with modern structure, cooling and acoustics.
A concept designed by Arab Creators, not a built project.
Exterior and site
Interiors
Details
Materials and details
- Mud-colour render, walls and minaret
- Tamarisk timber, ceilings and spouts
- Carved light stone, mihrab and columns
- Local stone, courtyard paving
Design idea
A neighbourhood mosque in the spirit of the Diriyah mosques: mud-colour walls, a square Najdi minaret, and a courtyard and arcade that shade worshippers before and after prayer. The simplicity is deliberate; the beauty lies in proportion and in light through the triangular openings.
Programme
A main hall for 1,200 worshippers and a women's hall for 250 with its own entrance, about 2,600 m². Separate ablution and washrooms for men and women, housing for the imam and muezzin, and parking to municipal requirements.
Build and upkeep
The structure is modern concrete behind the earth-colour render, and cooling uses low outlets or outlets hidden in columns so nothing shows on the timber ceiling. Acoustics need study because hard walls reflect sound, and the courtyard is paved in light local stone that does not heat up much.
How we apply it to your project
We adapt the idea to your plot, the municipal requirements and the Saudi Architecture guidelines for your site, then deliver architectural, structural and MEP drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15 and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.
More concepts
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Red Sea Coastal Villa
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
