Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffices · Riyadh · 2026

Engineering Consultancy Office

Headquarters for an engineering consultancy in a Riyadh tower: an oak and travertine reception, a corridor that shows the projects, a boardroom, an executive office, an open workspace and a hospitality corner.

A concept designed by Arab Creators, not a built project.

Reception and lounge Engineering Consultancy Office · Interior concept
Executive office Engineering Consultancy Office · Interior concept
Boardroom Engineering Consultancy Office · Interior concept
Open workspace Engineering Consultancy Office · Interior concept
Main corridor Engineering Consultancy Office · Interior concept
Hospitality corner Engineering Consultancy Office · Interior concept

Materials and details

  • Fluted natural oak for walls and counters
  • Honed travertine at reception and pantry
  • Navy upholstery in the brand colour
  • Light large-format porcelain floor
  • Suspended acoustic baffles over the workspace
  • Concealed linear lighting and track lights

Design idea

A headquarters that introduces the firm before its staff do: the reception shows an architectural model, the corridor is a wall of finished projects, and the boardroom has a screen for presenting models. A short list of materials repeats: oak, travertine and the brand navy, with live olive trees to soften the tower. The open workspace takes the daylight, and the closed rooms sit on the inner side.

Suggested spaces

An office floor of about 600 to 900 m² fits 35 to 55 staff, at roughly 10 to 12 m² per person including circulation and services. A boardroom for 12 to 16, two small meeting rooms, an executive office of about 30 m², a pantry, a prayer room and washrooms sized to headcount.

Build and upkeep

The design is coordinated with the tower's existing systems: HVAC, sprinklers, fire detection and exits, and any change needs building-management and Civil Defense approval. Glass meeting-room walls use double acoustic glazing, the baffles cut noise in the open workspace, and the oak on counters has a scratch-resistant finish.

How we apply it to your project

We design the headquarters on your actual floor plan and brand in a 3D model, then deliver construction drawings, MEP coordination and material and quantity schedules. Our published rates: full interior design 150 SAR per m² and 350 SAR per 3D view, excluding VAT. Details on interior design.

Video

Office film
Office reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: