Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptLuxury residence · Riyadh · 2026

Sky Penthouse

Interior design for a penthouse in a Riyadh tower: a double-height living room with a fluted walnut wall, a majlis with olive velvet floor seating and a Sadu rug, bronze mashrabiya screens, a green marble powder room and a terrace with a pool overlooking the city.

A concept designed by Arab Creators, not a built project.

Living room at dusk Sky Penthouse · Interior concept
Majlis Sky Penthouse · Interior concept
Living to dining Sky Penthouse · Interior concept
Dining room Sky Penthouse · Interior concept
Kitchen Sky Penthouse · Interior concept
Entrance foyer Sky Penthouse · Interior concept
Powder room Sky Penthouse · Interior concept
Master bedroom Sky Penthouse · Interior concept
Dressing room Sky Penthouse · Interior concept
Master bathroom Sky Penthouse · Interior concept
Roof terrace Sky Penthouse · Interior concept
Walnut and bronze detail Sky Penthouse · Interior concept
Reading corner Sky Penthouse · Interior concept
Material board Sky Penthouse · Interior concept

Materials and details

  • Fluted American walnut with thin bronze inlays
  • Honed cream travertine for floors, islands and tables
  • Green Verde Alpi marble for the powder room
  • Brushed bronze mashrabiya for screens and pergola
  • Ivory boucle and olive velvet upholstery
  • Hand-woven rugs with a Sadu pattern

Design idea

A high-floor penthouse that makes the city part of the decor: full-height glazing and a short list of warm materials repeated in every room so the home stays calm and coherent. Fluted walnut brings warmth, travertine brings weight, bronze ties them together, and the mashrabiya and Sadu weave carry a Saudi identity in a contemporary way without excess ornament. The majlis is the heart of hospitality, with continuous floor seating and a lit mashrabiya wall.

Suggested spaces

A penthouse of about 450 to 700 m² with an outdoor terrace of about 120 to 200 m². A double-height living room, a majlis of about 5 x 9 m near the front door, dining for ten, an open kitchen with an island plus a service kitchen, a master suite with dressing room and bathroom, and a powder room by the entrance.

Build and upkeep

In a tower the design needs building-management approval and a structural check of stone and travertine loads on the slab, especially the carved tub and islands. A terrace pool needs structural design, full waterproofing and its own drainage. Fireplaces in towers are electric or water-vapour, because open flame needs special Civil Defense requirements. Walnut in wet areas is treated or replaced with a moisture-resistant veneer.

How we apply it to your project

We design the penthouse on your actual floor plan and taste in a 3D model, then deliver construction drawings, details, MEP coordination and material and quantity schedules. Our published rates: full interior design 150 SAR per m² and 350 SAR per 3D view, excluding VAT. Details on interior design.

Video

Penthouse film
Penthouse reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: