Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptPrivate residence · Riyadh · 2026

Contemporary Najdi Villa

A contemporary Najdi villa in Riyadh: hand-troweled lime plaster and triangle crenellations, a courtyard with a pool and palms, a majlis with backlit Najdi niches, and travertine, oak and walnut details.

A concept designed by Arab Creators, not a built project.

Front elevation at dusk Contemporary Najdi Villa · Architectural concept
Courtyard and pool Contemporary Najdi Villa · Architectural concept
Courtyard, second view Contemporary Najdi Villa · Architectural concept
Entrance door Contemporary Najdi Villa · Architectural concept
Main hall Contemporary Najdi Villa · Architectural concept
Niche with clay jar Contemporary Najdi Villa · Architectural concept
Men's majlis Contemporary Najdi Villa · Architectural concept
Majlis, second view Contemporary Najdi Villa · Architectural concept
Arabic coffee service Contemporary Najdi Villa · Architectural concept
Family living room Contemporary Najdi Villa · Architectural concept
Fluted oak wall Contemporary Najdi Villa · Architectural concept
Dining room Contemporary Najdi Villa · Architectural concept
Table base Contemporary Najdi Villa · Architectural concept
Kitchen Contemporary Najdi Villa · Architectural concept
Clay pendants Contemporary Najdi Villa · Architectural concept
Master suite Contemporary Najdi Villa · Architectural concept
Bedside corner Contemporary Najdi Villa · Architectural concept
Lime plaster and crenellations Contemporary Najdi Villa · Architectural concept

Materials and details

  • Hand-troweled sand lime plaster
  • Najdi triangle crenellations and backlit niches
  • Athel timber loggia ceiling
  • Honed travertine for floors, stair and island
  • Fluted oak, walnut and bronze in joinery and lighting
  • Dark green stone pool lining

Design idea

The house wraps around an open courtyard with a long pool and palms, so every room takes its light and breeze from the inside while the street front stays calm and private. The front returns to the language of the Najdi house: a hand-finished lime wall, triangle crenellations, a deep arched entrance and narrow vertical windows. Inside, a short list of materials repeats throughout: travertine, oak, walnut, bronze and linen, so the house reads as one calm piece from the front door to the bedroom.

Suggested spaces

About 600 to 800 m² on two floors around a courtyard at least 8 m wide so daylight actually reaches it. A majlis of about 6 x 12 m with its own guest entrance, a family room opening straight onto the courtyard, a kitchen with a central island and a pantry, and the master suite upstairs away from guest movement.

Build and upkeep

The lime plaster goes on in coats over blockwork and is finished by hand, with water protection at parapets and bases. The athel ceiling hangs below a concrete slab and is treated against insects. The pool needs full waterproofing and chlorine-resistant stone. The cantilevered travertine stair needs a structural design for the cantilevers and a balustrade on the open side in the construction drawings.

How we apply it to your project

We adapt the idea to your plot, the municipality requirements and the Saudi architecture guidelines for your area, then deliver architectural, structural, MEP and interior drawings. Our published rates: architectural design 35 SAR per m², structural 15, MEP 15, full interior design 150 SAR per m² and 350 SAR per 3D view, excluding VAT. Worked examples in villa design cost.

Video

Villa film
Villa reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: