Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptVillas and palaces · Riyadh · 2026

Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook

Interior concept for a luxury villa kitchen in Riyadh built on the two-kitchen layout common in Saudi homes: a show kitchen with a quartzite island and appliances hidden behind panels, a separate back kitchen for heavy cooking with a powerful extractor and stainless worktops, a fluted-glass pantry, a family dining room and a breakfast nook.

A concept designed by Arab Creators, not a built project.

Show kitchen Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Island Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Pantry Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Back kitchen Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Dining Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Breakfast nook Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Detail Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept
Material palette Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook · Interior concept

Materials and details

  • Honed white quartzite
  • Warm greige lacquer
  • Brushed bronze
  • Fluted glass
  • Oak herringbone flooring
  • Stainless steel for the back kitchen

Design idea

A Saudi home usually has two kitchens: a clean show kitchen where family and guests gather, and a back kitchen for heavy cooking and large meals. We design both together with a short service route between them, so smells and heat stay at the back and the front stays calm.

Show kitchen

A large island for prep and seating, appliances integrated behind panels in the cabinet colour, and a pantry behind fluted glass doors. A short palette repeated: quartzite, greige lacquer and bronze.

Back kitchen

Stainless worktops and porcelain tiles that take heat and daily washing, an extractor sized for gas cooking, deep sinks for large pots and storage for provisions. We design ventilation, power and plumbing before choosing appliances.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Villa kitchen film
Villa kitchen reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: