Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffices and workspaces · Riyadh · 2026

Engineering Consultancy Office in Riyadh

Interior concept for an engineering consultancy in Riyadh: a board-formed concrete reception, an open design studio, a model shop, a glass boardroom, a BIM review room and a technical library.

A concept designed by Arab Creators, not a built project.

Reception Engineering Consultancy Office in Riyadh · Interior concept
Design studio Engineering Consultancy Office in Riyadh · Interior concept
Model shop Engineering Consultancy Office in Riyadh · Interior concept
Boardroom Engineering Consultancy Office in Riyadh · Interior concept
BIM room Engineering Consultancy Office in Riyadh · Interior concept
Technical library Engineering Consultancy Office in Riyadh · Interior concept
Detail Engineering Consultancy Office in Riyadh · Interior concept
Material palette Engineering Consultancy Office in Riyadh · Interior concept

Materials and details

  • Board-formed exposed concrete
  • White oak
  • Matt blackened steel
  • Beige stone
  • Terracotta
  • Felt acoustic panels

Design idea

An engineering office is a workshop before it is a showroom: concrete and steel show how things are built, and oak warms the space. The studio is open and the routes between design, models and review are short.

Space plan

A reception that shows the practice's work, an open design studio, a glazed model shop that keeps dust and noise out, a glass boardroom, a BIM room for model reviews with clients, and a technical library for specifications and files.

Acoustics and lighting

Concrete reflects sound, so felt panels go on walls and above desks. Lighting is direct linear over drawing tables, with warm concealed light on the shelving.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Engineering office film
Engineering office reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: