Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffices and workspaces · Riyadh · 2026

Coworking Space, Riyadh

Interior concept for a coworking space in Riyadh: a reception with a curved terracotta counter, hot desks with a city view, a glass meeting room, a lounge with a coffee corner, private team offices and an event space with timber tiered seating, in oak, felt, terracotta, black metal and polished concrete.

A concept designed by Arab Creators, not a built project.

Hot desks Coworking Space, Riyadh · Interior concept
Reception Coworking Space, Riyadh · Interior concept
Meeting room Coworking Space, Riyadh · Interior concept
Lounge and café Coworking Space, Riyadh · Interior concept
Private offices Coworking Space, Riyadh · Interior concept
Event space Coworking Space, Riyadh · Interior concept
Material palette Coworking Space, Riyadh · Interior concept

Materials and details

  • Light oak tables and cladding
  • Grey felt acoustic treatment and sofas
  • Terracotta counter and seating
  • Black metal legs and frames
  • Polished concrete floors
  • Clear glass partitions

Design idea

A flexible workspace with daylight and simple materials that take daily use. Terracotta adds local warmth, felt controls sound in open areas, and planting softens the office.

Suggested spaces

A space of about 800 to 2,000 m². Reception, hot desks, fixed desks, private team offices, meeting rooms of several sizes, phone booths, a lounge and kitchen, and an event space.

Build and upkeep

Glass partitions and private offices follow the column and window grid so the floor can be re-planned. Acoustic felt needs a fire-rated specification, polished concrete needs a sealer, and power and data routes through the floor or exposed ceilings need early coordination.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Coworking space film
Coworking space reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: