Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptLuxury residence · Riyadh · 2026

Contemporary Najdi Palace, Riyadh

Architectural and interior concept for a private palace in Riyadh that reworks Najdi architecture in a contemporary language: low sand-rendered volumes with clean stepped parapets, triangular openings, carved timber doors, three courtyards of shade and water, and a Najdi majlis for forty under a ceiling of tamarisk beams and palm fronds.

A concept designed by Arab Creators, not a built project.

Main facade at sunset Contemporary Najdi Palace, Riyadh · Architectural concept
Courtyard (hosh) Contemporary Najdi Palace, Riyadh · Architectural concept
Entrance hall Contemporary Najdi Palace, Riyadh · Architectural concept
Najdi majlis Contemporary Najdi Palace, Riyadh · Architectural concept
Family living room Contemporary Najdi Palace, Riyadh · Architectural concept
Ladies’ majlis Contemporary Najdi Palace, Riyadh · Architectural concept
Master suite Contemporary Najdi Palace, Riyadh · Architectural concept
Master bathroom Contemporary Najdi Palace, Riyadh · Architectural concept
Library Contemporary Najdi Palace, Riyadh · Architectural concept
Roof terrace at dusk Contemporary Najdi Palace, Riyadh · Architectural concept
Najdi door detail Contemporary Najdi Palace, Riyadh · Architectural concept
Aerial view of the palace Contemporary Najdi Palace, Riyadh · Architectural concept
Material board Contemporary Najdi Palace, Riyadh · Architectural concept

Materials and details

  • Sand-toned lime render for facades and interior walls
  • Earth-textured walls
  • Limestone for floors and basins
  • Tamarisk timber and palm fronds for ceilings
  • Carved timber doors and brass details
  • Natural linen and Sadu weaving for soft furnishings

Design idea

A private palace that rereads Najdi architecture: thick walls, small openings and the courtyard at the heart of the house, in modern lines and calm proportions. Stepped parapets become clean edges, triangular openings admit light and block heat, tamarisk and palm fronds warm the ceilings, and colourful Najdi ornament is kept to doors and friezes.

Suggested spaces

A palace on a plot of about 4,000 to 8,000 m² with about 2,000 to 3,500 m² of built area. Three courtyards, an entrance hall, a men’s majlis for forty with its own entrance, a ladies’ majlis, dining for sixteen, a family living room, a master suite, a library and a roof terrace.

Build and upkeep

The earth texture is built today as a lime or modified cement render with an earth finish over thermally insulated blockwork, not as structural mud. Timber ceilings are suspended linings under a concrete slab, with timber treated against insects and moisture. Small openings need a daylight study, and courtyards and water channels need waterproofing and their own drainage.

How we apply it to your project

We design the palace on your plot and brief in a 3D model, then deliver architectural, structural and MEP drawings, construction details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on architectural design and interior design.

Video

Najdi palace film
Najdi palace reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: