Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptLuxury residence · Riyadh · 2026

Contemporary Palace, Riyadh

Architectural and interior concept for a private palace in Riyadh in a calm contemporary language: low travertine volumes around three courtyards, deep cantilevered roofs and bronze fins for shade, a stone water channel on the entry axis, and a majlis for forty under an oak slatted ceiling, in travertine, limestone, marble, oak and dark bronze.

A concept designed by Arab Creators, not a built project.

Main facade at dusk Contemporary Palace, Riyadh · Architectural concept
Main courtyard Contemporary Palace, Riyadh · Architectural concept
Entrance hall Contemporary Palace, Riyadh · Architectural concept
Grand majlis Contemporary Palace, Riyadh · Architectural concept
Dining room Contemporary Palace, Riyadh · Architectural concept
Family living room Contemporary Palace, Riyadh · Architectural concept
Ladies’ majlis Contemporary Palace, Riyadh · Architectural concept
Master suite Contemporary Palace, Riyadh · Architectural concept
Master bathroom Contemporary Palace, Riyadh · Architectural concept
Library Contemporary Palace, Riyadh · Architectural concept
Garden terrace at sunset Contemporary Palace, Riyadh · Architectural concept
Aerial view of the palace Contemporary Palace, Riyadh · Architectural concept
Material board in the courtyard Contemporary Palace, Riyadh · Architectural concept

Materials and details

  • Ivory travertine for facades, floors and tables
  • Honed limestone for interior walls and fireplaces
  • Book-matched marble for the entrance hall and bathrooms
  • Dark bronze for fins, doors, fittings and lighting
  • Oak for ceilings, floors and shelving
  • Sand boucle, linen and a backlit onyx wall

Design idea

A private palace in a calm contemporary language suited to Riyadh’s climate: low volumes around three courtyards, deep cantilevered roofs that shade the glass, and vertical bronze fins that cut low sun. Water on the entry axis and in the courtyards cools the air and reflects the facades. Few materials, repeated on purpose: travertine inside and out, oak for warmth and dark bronze for detail.

Suggested spaces

A palace on a plot of about 4,000 to 8,000 m² with about 2,000 to 3,500 m² of built area. A double-height entrance hall, a grand majlis for forty with its own entrance, a ladies’ majlis, dining for sixteen, a family living room, a master suite with bathroom, a library and a garden terrace with a water channel.

Build and upkeep

External travertine cladding is fixed mechanically with stainless anchors on a separate frame with movement joints, and sealed because the stone is porous. Long cantilevered roofs need structural design for large spans, and large glazing needs insulated low-emissivity glass. Water channels and basins need waterproofing, water treatment, pumps and their own drainage, and bronze needs a protective coating and periodic care.

How we apply it to your project

We design the palace on your plot and brief in a 3D model, then deliver architectural, structural and MEP drawings, construction details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on architectural design and interior design.

Video

Contemporary palace film
Contemporary palace reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: