Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptLuxury residence · Riyadh · 2026

Private Palace, Riyadh

Architectural and interior concept for a private palace in Riyadh in a contemporary Saudi classical style: a limestone facade with a colonnade and dome, an inner courtyard with a fountain, an entrance hall with a double staircase, a grand majlis and a ladies’ salon, and a master suite, in Calacatta and Botticino marble, carved gypsum and silk.

A concept designed by Arab Creators, not a built project.

Main facade at dusk Private Palace, Riyadh · Architectural concept
Inner courtyard Private Palace, Riyadh · Architectural concept
Entrance hall Private Palace, Riyadh · Architectural concept
Grand majlis Private Palace, Riyadh · Architectural concept
Ladies’ salon Private Palace, Riyadh · Architectural concept
Formal dining room Private Palace, Riyadh · Architectural concept
Family living room Private Palace, Riyadh · Architectural concept
Master suite Private Palace, Riyadh · Architectural concept
Master bathroom Private Palace, Riyadh · Architectural concept
Dressing room Private Palace, Riyadh · Architectural concept
Private office Private Palace, Riyadh · Architectural concept
Ceiling detail Private Palace, Riyadh · Architectural concept
Console detail Private Palace, Riyadh · Architectural concept
Material board Private Palace, Riyadh · Architectural concept

Materials and details

  • Ivory Calacatta and cream Botticino marble for floors and walls
  • Cream limestone for facades and arcades
  • Hand-carved gypsum with star patterns for ceilings and cornices
  • Champagne-finish metal for balustrades, frames and fittings
  • Ivory silk, champagne velvet and emerald velvet upholstery
  • Crystal chandeliers and warm concealed lighting

Design idea

A private palace in a contemporary Saudi classical language: strict symmetry and clear axes from the gate to the courtyard and the entrance hall, and a short list of materials repeated in every space so the luxury stays calm rather than showy. Ivory marble brings light, carved gypsum with star patterns carries the identity, emerald appears in measured doses in upholstery and curtains, and champagne metal ties the details together.

Suggested spaces

A palace on a plot of about 3,000 to 6,000 m² with about 1,500 to 3,000 m² of built area. A double- or triple-height entrance hall, a grand men’s majlis and a ladies’ salon each with its own entrance, formal dining for twenty, a family living room, a master suite with dressing room and bathroom, a private office, and an inner courtyard that brings light and air into the rooms.

Build and upkeep

Stone facades are fixed with an engineered mechanical anchoring system, and domes and long spans need dedicated structural design. Heavy chandeliers hang from load points designed into the slab, not from the suspended ceiling, and large gypsum ornaments are made as precast pieces with secure fixings. Polished marble in bathrooms and entrances gets an anti-slip surface treatment, and fountains and pools need waterproofing, water treatment and their own drainage.

How we apply it to your project

We design the palace on your plot and brief in a 3D model, then deliver architectural, structural and MEP drawings, construction details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on architectural design and interior design. From our founding team’s palace work: marble and gilding in a palace interior, waterjet-cut marble floors and the structural shell of a private palace.

Video

Palace film
Palace reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: