Architectural conceptLuxury residence · Riyadh · 2026
Andalusian Palace, Riyadh
Architectural and interior concept for a private palace in Riyadh inspired by Andalusian architecture: a horseshoe-arched gateway in carved stucco, a courtyard with a water channel between orange trees, a muqarnas-domed entrance hall, a majlis with velvet seating under a carved cedar ceiling, and a garden pavilion, in zellige, carved stucco, marble and cedar.
A concept designed by Arab Creators, not a built project.
Materials and details
- Handmade zellige in teal, cobalt, ivory and terracotta star patterns
- Hand-carved stucco for walls, arches and muqarnas
- Carved and painted cedar for ceilings, screens and cabinetry
- White marble for columns, fountains and floors
- Terracotta and ivory tiles for warm floors
- Pierced brass lanterns, teal velvet and ivory linen
Design idea
A private palace that draws on Andalusian architecture and adapts it to Riyadh’s climate: water, shade and the courtyard at the heart of the house, with a clear axis from the gate to the courtyard and the entrance hall. Carved stucco and zellige carry the ornament, cedar brings warmth to ceilings and screens, teal appears in measured doses in upholstery and tiles, and pierced brass draws patterned shadows at night.
Suggested spaces
A palace on a plot of about 3,000 to 6,000 m² with about 1,500 to 3,000 m² of built area. A main courtyard with a water channel, a domed entrance hall, a men’s majlis with its own entrance, a ladies’ salon onto the garden, dining for eighteen, a family living room, a master suite with bathroom, a library and a garden pavilion.
Build and upkeep
Handmade zellige is laid on a flat render with a suitable adhesive and its joints are sealed against moisture; large carved stucco pieces and muqarnas are made as precast elements with mechanical fixings to the structure. Exposed cedar is treated against insects and moisture, water channels and fountains need waterproofing, water treatment, pumps and their own drainage, and domes need dedicated structural design.
How we apply it to your project
We design the palace on your plot and brief in a 3D model, then deliver architectural, structural and MEP drawings, construction details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on architectural design and interior design.
Video
More concepts
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
