Architectural conceptResidential & leisure · Riyadh · 2026
Private Istiraha, Riyadh
Architectural and interior concept for a luxury private istiraha on the outskirts of Riyadh: a black steel and palm wood gate, a green courtyard with a water channel, an outdoor majlis around a fire pit, an indoor majlis, a pool with cabanas, an outdoor kitchen with a table for twenty and a football pitch, in sand stone, white render, palm wood and terracotta.
A concept designed by Arab Creators, not a built project.
Materials and details
- Sand stone for walls
- Warm white render
- Palm wood for pergolas and ceilings
- Terracotta tiles
- Black steel for gates and canopies
- Cream linen and brass lanterns
Design idea
A retreat for family gatherings and guests where life happens outdoors more than in: a green courtyard ties the spaces together, with open and closed majlis, pergola shade by day and fire and lanterns by night. Materials are local and simple, built to take sun and dust.
Suggested spaces
An istiraha on a plot of about 2,500 to 6,000 m². Courtyard, outdoor and indoor majlis, a pool with cabanas, an outdoor kitchen and large dining table, a family living room, guest rooms and a small pitch.
Build and upkeep
Sand stone needs treatment against moisture and salts, and pergola timber against sun and insects. The pool and channels need waterproofing and a pump room, and courtyard and pitch lighting need weatherproof external electrical design.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
