Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptHospitality · Riyadh · 2026

Boutique Hotel, Riyadh

Interior concept for a luxury boutique hotel in Riyadh with a contemporary Najdi spirit: an arrival lounge and lobby with a travertine desk, a coffee and tea bar, a restaurant with arched openings, rooms and suites with city views, a spa and a rooftop facing the Riyadh skyline, in walnut, travertine, velvet, brass and handwoven textiles.

A concept designed by Arab Creators, not a built project.

Rooftop at sunset Boutique Hotel, Riyadh · Interior concept
Arrival lounge Boutique Hotel, Riyadh · Interior concept
Lobby Boutique Hotel, Riyadh · Interior concept
Coffee and tea bar Boutique Hotel, Riyadh · Interior concept
Restaurant Boutique Hotel, Riyadh · Interior concept
Guest corridor Boutique Hotel, Riyadh · Interior concept
Deluxe room Boutique Hotel, Riyadh · Interior concept
Guest bathroom Boutique Hotel, Riyadh · Interior concept
Suite living room Boutique Hotel, Riyadh · Interior concept
Spa Boutique Hotel, Riyadh · Interior concept
Textile detail Boutique Hotel, Riyadh · Interior concept
Material board Boutique Hotel, Riyadh · Interior concept

Materials and details

  • Walnut for panelling and furniture
  • Honey travertine for floors and counters
  • Teal velvet upholstery
  • Antique brass for lighting and details
  • Handwoven Najdi-pattern textiles
  • Linen for drapes and bedding

Design idea

A small hotel with a clear character: warm materials, deep colours and a Najdi touch in textiles and patterns rather than literal ornament. Guests move from a calm arrival to an intimate lobby to a room that feels like home, with the rooftop as the high point over the skyline.

Suggested spaces

A boutique hotel of about 40 to 80 keys. Arrival lounge, lobby, coffee and tea bar, all-day restaurant, rooms and suites, a spa and a rooftop lounge.

Build and compliance

Hotel design follows Ministry of Tourism and Civil Defence requirements: fire-rated fabrics and carpets, acoustic separation between rooms and emergency egress. Travertine needs stain protection in the restaurant and bar.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Boutique hotel film
Boutique hotel reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: