Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptEngineering offices · Cairo · 2026

Arab Creators Studio, Cairo

Interior concept for our new office in Cairo: a residential floor of two facing apartments around a shared stair turned into an engineering studio. CAD and BIM workstations along the windows, a reception with the brand wall, a conference room, a model review room and a collaboration spine where the two apartments meet, in navy, gold and oak.

A concept designed by Arab Creators, not a built project.

Reception Arab Creators Studio, Cairo · Interior concept
Production studio Arab Creators Studio, Cairo · Interior concept
Conference room Arab Creators Studio, Cairo · Interior concept
Principal’s office Arab Creators Studio, Cairo · Interior concept
BIM review room Arab Creators Studio, Cairo · Interior concept
Collaboration spine Arab Creators Studio, Cairo · Interior concept
Call booths Arab Creators Studio, Cairo · Interior concept
Pantry Arab Creators Studio, Cairo · Interior concept
Plot and archive Arab Creators Studio, Cairo · Interior concept
Entrance Arab Creators Studio, Cairo · Interior concept
Workstation detail Arab Creators Studio, Cairo · Interior concept
Material board Arab Creators Studio, Cairo · Interior concept

Materials and details

  • Navy acoustic felt for walls, ceilings and booths
  • Brushed gold metal for details and lighting
  • Light oak for desks and shelving
  • Terrazzo-look grey porcelain for floors
  • White quartz for tops
  • Black metal profiles and glass for partitions

Design idea

The office is split into an "engine" and a "showroom". The engine is the CAD and BIM studio along the daylit facades; the showroom is the reception and conference room by the entrance, where clients meet the brand. A collaboration spine joins the two apartments once the shared wall is opened, and navy and gold carry the identity through every space.

Spaces

A residential floor of about 277 m² with two facing apartments around a shared stair. Reception, production studio, conference room, principal’s office, BIM review room, collaboration spine, call booths, pantry and a plot and archive room.

Build

Opening the wall between the apartments needs a structural review before demolition; power and data are redesigned for office loads, and air conditioning is split into separate zones. Acoustic felt must be fire-rated, and glass partitions use metal profiles and toughened glass.

We design your office the same way

We turn apartments and residential or commercial floors into working offices in your company’s identity: 3D design, construction drawings, quantity schedules and site follow-up. Details on interior design.

Video

Arab Creators studio film
Arab Creators studio reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: