Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architectural conceptLuxury residence · Riyadh · 2026

Neoclassical Palace, Riyadh

Architectural and interior concept for a private palace in Riyadh in the neoclassical style: a symmetrical ivory limestone facade with a Corinthian portico, a foyer with a double imperial staircase, dining for twenty-four, a two-storey library, an indoor pool and a formal garden, in marble, limestone, silk and walnut with measured gold accents.

A concept designed by Arab Creators, not a built project.

Main facade at sunset Neoclassical Palace, Riyadh · Architectural concept
Grand foyer Neoclassical Palace, Riyadh · Architectural concept
Formal dining room Neoclassical Palace, Riyadh · Architectural concept
Ladies’ salon Neoclassical Palace, Riyadh · Architectural concept
Classical library Neoclassical Palace, Riyadh · Architectural concept
Master suite Neoclassical Palace, Riyadh · Architectural concept
Master bathroom Neoclassical Palace, Riyadh · Architectural concept
Indoor pool Neoclassical Palace, Riyadh · Architectural concept
Garden terrace at sunset Neoclassical Palace, Riyadh · Architectural concept
Corinthian capital detail Neoclassical Palace, Riyadh · Architectural concept
Material board Neoclassical Palace, Riyadh · Architectural concept

Materials and details

  • Ivory limestone for facades, columns and cornices
  • Calacatta and Carrara marble for floors and bathrooms
  • Plaster with gilded mouldings for ceilings and walls
  • Walnut for doors, library and tables
  • Champagne silk for upholstery and drapes
  • Crystal chandeliers and gold fittings

Design idea

A private palace in a disciplined classical language: clear symmetry and axes from the gate to the foyer and on to the garden, columns and cornices in correct proportion, and gold used in details rather than over every surface. Ivory limestone and white marble bring light and clarity; walnut and silk bring warmth.

Suggested spaces

A palace on a plot of about 5,000 to 10,000 m² with about 2,500 to 4,500 m² of built area. A foyer with a double stair, a grand majlis for fifty, dining for twenty-four, a ladies’ salon, a library, a master suite, an indoor pool and a formal garden.

Build and upkeep

Limestone cladding and columns are fixed mechanically; large cornices and capitals are made in stone or GRC depending on budget and weight. Gold is gold leaf or a coated paint finish, and marble needs a stain sealer. An indoor pool needs ventilation, dehumidification and dedicated waterproofing.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Neoclassical palace film
Neoclassical palace reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: