Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffice headquarters · Riyadh · 2026

Corporate Headquarters, Riyadh

Interior concept for a corporate headquarters in Riyadh: a double-height reception, a boardroom for twenty, a CEO office facing the skyline, an open workspace, a staff cafe, meeting pods, town-hall steps and a VIP majlis, in oak, terrazzo, acoustic fabric, black metal and brass.

A concept designed by Arab Creators, not a built project.

Reception Corporate Headquarters, Riyadh · Interior concept
Boardroom Corporate Headquarters, Riyadh · Interior concept
CEO office Corporate Headquarters, Riyadh · Interior concept
Open workspace Corporate Headquarters, Riyadh · Interior concept
Staff cafe Corporate Headquarters, Riyadh · Interior concept
Meeting pods Corporate Headquarters, Riyadh · Interior concept
Town-hall steps Corporate Headquarters, Riyadh · Interior concept
Focus zone Corporate Headquarters, Riyadh · Interior concept
VIP majlis Corporate Headquarters, Riyadh · Interior concept
Executive corridor Corporate Headquarters, Riyadh · Interior concept
Material board Corporate Headquarters, Riyadh · Interior concept

Materials and details

  • Natural oak for panelling, desks and ceilings
  • Terrazzo for floors and tops
  • Sand acoustic fabric panels
  • Black metal for glass partitions
  • Brass for details and lighting
  • Olive and grey fabrics and carpet

Design idea

An office headquarters that balances the company’s image for guests with the team’s daily comfort. Reception, majlis and boardroom use warmer, richer materials; work areas use practical materials with designed acoustics. Oak and terrazzo tie the floor together, with olive and brass as measured accents.

Suggested spaces

An office floor of about 1,200 to 2,000 m². Reception, boardroom, executive office, an open workspace for about 80 to 120 staff, meeting pods, a cafe, town-hall steps and a VIP majlis.

Build and upkeep

Glass partitions use metal profiles and toughened acoustic glass, and ceilings carry suspended acoustic baffles. Terrazzo needs periodic sealing, and acoustic fabric must be fire-rated to Civil Defence requirements. Linear and cove lighting must be coordinated with HVAC diffusers and sprinklers.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Corporate headquarters film
Corporate headquarters reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: