Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptHealthcare · Riyadh · 2026

Specialist Clinic, Riyadh

Interior concept for a specialist clinic in Riyadh with a calm, hospitality-grade feel: a curved oak reception, family waiting niches, consultation and treatment rooms, a dental suite, a children’s corner, a pharmacy, a VIP lounge and a sample collection room, in easy-clean oak, solid surfaces, porcelain and brass.

A concept designed by Arab Creators, not a built project.

Reception Specialist Clinic, Riyadh · Interior concept
Waiting lounge Specialist Clinic, Riyadh · Interior concept
Consultation room Specialist Clinic, Riyadh · Interior concept
Treatment room Specialist Clinic, Riyadh · Interior concept
Corridor Specialist Clinic, Riyadh · Interior concept
Dental suite Specialist Clinic, Riyadh · Interior concept
Children’s corner Specialist Clinic, Riyadh · Interior concept
Pharmacy Specialist Clinic, Riyadh · Interior concept
VIP lounge Specialist Clinic, Riyadh · Interior concept
Sample collection Specialist Clinic, Riyadh · Interior concept
Material board Specialist Clinic, Riyadh · Interior concept

Materials and details

  • Light oak for panelling, doors and furniture
  • Antibacterial solid surfaces for counters and basins
  • Terrazzo-look porcelain floors
  • Washable sage paint
  • Brushed brass details
  • Easy-clean healthcare fabrics

Design idea

A clinic that calms the patient before they meet the doctor: soft greens, warm timber and indirect light, with easy-clean, antibacterial materials on every surface a patient touches. The patient route runs clearly from reception to waiting to consultation, with a separate VIP lounge.

Suggested spaces

A clinic of about 400 to 900 m². Reception, family waiting, consultation and treatment rooms, a dental suite, a children’s corner, a pharmacy, a sample collection room, a VIP lounge, stores and services.

Build and compliance

Clinic design follows Ministry of Health and Civil Defence requirements: room and door sizes, hand-wash basins, ventilation and air changes, and jointless floors in clinical rooms. Solid surfaces and washable paints need specification approval before procurement.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Specialist clinic film
Specialist clinic reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: