Architectural conceptLuxury residence · Riyadh · 2026
Modern Luxury Villa, Riyadh
Architectural and interior concept for a modern luxury villa in Riyadh: a facade in greige plaster and travertine with bronze glazing, a double-height living room, a men’s majlis, dining for twelve, a kitchen with an island, a floating stair, a master bathroom, a dressing room and a pool terrace.
A concept designed by Arab Creators, not a built project.
Materials and details
- Greige plaster for facades and walls
- Travertine-look porcelain floors
- Smoked oak panelling and joinery
- Bronze glazing and fittings
- Black marble for fireplace, vanities and table
- Cream boucle upholstery
Design idea
A modern villa with quiet luxury: warm neutrals, a few repeated materials and layered light that brings out the texture of plaster and timber. Bronze and black marble add measured depth, and the double-height living room links both floors with light.
Suggested spaces
A villa on a plot of about 600 to 1,200 m² with about 700 to 1,200 m² built. Double-height living, men’s majlis, dining, a kitchen with an island, a master suite with bathroom and dressing room, and a pool terrace.
Build and upkeep
Decorative plaster needs specialist applicators and an approved sample before work starts, and travertine-look porcelain is easier to maintain than natural stone. Black marble needs sealing, and bronze-framed windows need insulated low-emissivity glass.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
