Interior conceptHospitality and restaurants · Riyadh · 2026
Fine Dining Restaurant, Riyadh
Interior concept for a fine dining restaurant in Riyadh: an entrance with a walnut door in a brass frame, a dining hall with leather banquettes, brass pendants and mashrabiya screens, a chef’s table facing an open kitchen and a lounge, in charcoal plaster, smoked oak, leather, aged brass and green marble.
A concept designed by Arab Creators, not a built project.
Materials and details
- Charcoal plaster walls
- Smoked oak tables and panelling
- Burnt orange leather seating
- Aged brass lighting, trims and screens
- Green marble counters and tables
- Dark stone flooring
Design idea
A restaurant with low light and dark materials that put the table and the food at the centre. Orange leather and brass bring warmth, and green marble links the entrance, the chef’s table and the hall. Mashrabiya screens divide the hall into more private corners for families and business guests.
Suggested spaces
A restaurant of about 400 to 900 m². Entrance and lounge, main dining hall, chef’s table, private dining rooms, an open kitchen and a back kitchen, and washrooms.
Build and upkeep
The open kitchen needs early coordination of hoods, kitchen fire suppression and municipal and Civil Defense requirements. Leather and fabrics need fire-rated, easy-clean specifications, and marble needs a stain and acid sealer.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Executive Diwan, Riyadh
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
