Interior conceptOffice headquarters · Riyadh · 2026
Executive Diwan, Riyadh
Interior concept for a chairman’s executive floor in Riyadh: a diwan for thirty with a walnut coffered ceiling and handwoven carpet, a reception, the chairman’s office with a city view, a board room for sixteen, a private dining room and an executive corridor, in walnut, limestone, green leather and bronze.
A concept designed by Arab Creators, not a built project.
Materials and details
- Dark walnut panelling, ceilings and furniture
- Cream limestone walls and floors
- Green leather seating
- Antique bronze lighting and inlays
- Handwoven carpet
- Cream upholstery
Design idea
A floor that reflects the standing of the office and the generosity of Saudi hospitality: the diwan is the heart, materials are deep and warm, and lighting is indirect. Green leather, walnut and bronze give a formal character that will not date.
Suggested spaces
An executive floor of about 600 to 1,200 m². Reception, a diwan for thirty, the chairman’s office, a board room, a private dining room, secretarial offices and hospitality services.
Build and upkeep
Timber panelling is workshop-made and fixed on concealed hanging systems, and coffered ceilings need coordination with HVAC, sprinklers and lighting. Leather and carpet need fire-rated specifications, and limestone needs a stain sealer.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
