Interior conceptLuxury retail · Riyadh · 2026
Jewellery Boutique, Riyadh
Interior concept for a luxury jewellery boutique in Riyadh: an arched glass storefront with a brass frame, a main salon with cases on onyx plinths, a wall of lined display niches, a VIP room, a bridal corner and a cash and wrap counter, with precise light on every piece.
A concept designed by Arab Creators, not a built project.
Materials and details
- Ivory plaster for walls and ceilings
- Champagne brass for cases and trims
- Backlit blush onyx
- Smoked and low-iron glass
- Cream suede display lining
- Walnut for counters
Design idea
A boutique where the piece is the hero: quiet ivory and blush backgrounds, precise light on every case, and a route from the storefront to the salon and on to a private room for the decision. Backlit onyx gives luxury without noise.
Suggested spaces
A boutique of about 80 to 250 m² in a mall or on a retail street. Storefront, display salon, niche wall, VIP room, bridal corner, cash counter, safe and secure store.
Build and security
Cases need toughened or laminated security glass, locks and alarms, and lighting needs low heat and high colour rendering to show stones. Onyx needs backing support and LED lighting with heat dissipation, and the fit-out follows mall and Civil Defence requirements.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
