Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffices and headquarters · Riyadh · 2026

Law Firm Office, Riyadh

Interior concept for a law firm in Riyadh: a double-height reception, a law library, a board room for sixteen, a partner office with a city view, a client majlis and a corridor of glass-fronted offices, in walnut, travertine, navy leather, bronze and oak parquet.

A concept designed by Arab Creators, not a built project.

Partner office Law Firm Office, Riyadh · Interior concept
Reception Law Firm Office, Riyadh · Interior concept
Law library Law Firm Office, Riyadh · Interior concept
Board room Law Firm Office, Riyadh · Interior concept
Client majlis Law Firm Office, Riyadh · Interior concept
Corridor Law Firm Office, Riyadh · Interior concept
Material detail Law Firm Office, Riyadh · Interior concept
Material palette Law Firm Office, Riyadh · Interior concept

Materials and details

  • Walnut panelling, desks and shelving
  • Cream travertine walls and reception
  • Navy leather seating
  • Polished bronze lighting and inlays
  • Herringbone oak parquet
  • Acoustic fabric panels in meeting rooms

Design idea

An office that reflects the trust and composure of the profession: walnut and travertine give a warm formal character, navy leather adds depth, and glass opens offices to the corridor while keeping acoustic privacy. The client majlis offers Saudi hospitality before the meeting.

Suggested spaces

An office of about 500 to 1,500 m². Reception, client majlis, a main board room and small meeting rooms, partner and lawyer offices, a library and archive, a secretarial area and services.

Build and upkeep

Glass partitions need acoustic ratings suited to confidential meetings, and timber panelling is workshop-made and fixed on concealed hanging systems. The archive needs ventilation and fire protection, and travertine needs a stain sealer.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Law firm office film
Law firm office reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: