Interior conceptCommercial showrooms · Riyadh · 2026
Luxury Car Showroom, Riyadh
Interior concept for a luxury car showroom in Riyadh: a double-height glass facade, a main showroom hall, a delivery bay with a turntable, a customer lounge, a configurator studio and a VIP mezzanine, in terrazzo, black steel, smoked oak, warm grey stone and linear lighting.
A concept designed by Arab Creators, not a built project.
Materials and details
- Polished white terrazzo floors
- Black steel structure, frames and stair
- Smoked oak walls and cladding
- Warm grey stone feature walls
- Linear LED ceiling lighting
- Double-height facade glazing
Design idea
A showroom that makes the car the hero: a light floor that reflects light, a black steel frame around the space and linear lighting that brings out the lines of the cars. The customer journey runs from the hall to the configurator and the delivery bay.
Suggested spaces
A showroom of about 1,000 to 3,000 m². Showroom hall, delivery bay, customer lounge, configurator studio, VIP mezzanine, sales offices and a service area.
Build and upkeep
Showroom floors need high load capacity for vehicles and resistance to stains and oil, and large glass facades need solar-control glazing coordinated with HVAC. Lighting needs a high colour rendering index to show car colours accurately.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Private Banking Centre, Riyadh
- Tech Company Headquarters, Riyadh
- Family Office, Riyadh
- Real Estate Sales Gallery, Riyadh
- Law Firm Office, Riyadh
- Coworking Space, Riyadh
- Fine Dining Restaurant, Riyadh
- Executive Diwan, Riyadh
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
