Interior conceptOffices and headquarters · Riyadh · 2026
Family Office, Riyadh
Interior concept for a family office headquarters in Riyadh: an arrival lobby, a family majlis, an investment committee room, the principal office with a city view, a library and archive and a private dining room, in travertine, oak, wool, smoked glass and antique gold.
A concept designed by Arab Creators, not a built project.
Materials and details
- Honey travertine walls, tables and reception
- Oak panelling, ceilings and shelving
- Olive wool and leather seating
- Smoked glass partitions
- Antique gold lighting and inlays
- Handwoven rugs
Design idea
A headquarters that joins family privacy with the formality of investment decisions: the majlis for the family, the committee room for decisions and the library to keep the legacy. Travertine, oak and olive green give a calm, lasting dignity.
Suggested spaces
A headquarters of about 600 to 1,500 m². Reception, majlis, a main board room, offices for family members and the finance team, a library and secure archive, a dining room and hospitality services.
Build and upkeep
The archive needs temperature, humidity and fire control, and meeting rooms need acoustic separation for confidential discussions. Travertine needs filling and sealing, and timber panelling is workshop-made.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Real Estate Sales Gallery, Riyadh
- Law Firm Office, Riyadh
- Coworking Space, Riyadh
- Fine Dining Restaurant, Riyadh
- Executive Diwan, Riyadh
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
