Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptSales galleries and showrooms · Riyadh · 2026

Real Estate Sales Gallery, Riyadh

Interior concept for a real estate developer sales gallery in Riyadh: an arched marble entrance, a model hall, a VIP lounge, a media room, a contract signing room and a finishes library, in marble, oak, bronze, velvet and linen.

A concept designed by Arab Creators, not a built project.

Model hall Real Estate Sales Gallery, Riyadh · Interior concept
Entrance Real Estate Sales Gallery, Riyadh · Interior concept
VIP lounge Real Estate Sales Gallery, Riyadh · Interior concept
Media room Real Estate Sales Gallery, Riyadh · Interior concept
Signing room Real Estate Sales Gallery, Riyadh · Interior concept
Finishes library Real Estate Sales Gallery, Riyadh · Interior concept
Material detail Real Estate Sales Gallery, Riyadh · Interior concept
Material palette Real Estate Sales Gallery, Riyadh · Interior concept

Materials and details

  • Calacatta marble floors, portals and tables
  • Fluted light oak cladding and ceilings
  • Champagne bronze trims and lighting
  • Sage velvet seating
  • Linen curtains and chairs
  • Concealed light in niches and ceilings

Design idea

A gallery that sells the project before it is built: a clear route from the entrance to the model, the media room, the finishes library and the signing room. Light materials, marble and sage velvet give the calm sense of quality buyers expect.

Suggested spaces

A gallery of about 400 to 1,200 m². Entrance and reception, a model hall, a VIP lounge, a media room, signing rooms, a finishes library, a show apartment if needed, and sales team offices.

Build and upkeep

Sales galleries are often temporary or on short programmes, so we suggest prefabricated, reusable cladding systems. The screen needs power, cooling and acoustic coordination, and polished marble needs a sealer and regular care.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Sales gallery film
Sales gallery reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: