Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffices and headquarters · Riyadh · 2026

Private Banking Centre, Riyadh

Interior concept for a private banking centre in Riyadh: an arrival lobby, a client lounge, a relationship manager office, a private meeting room, a VIP majlis and a corridor, in green marble, limestone, dark oak, leather and brass.

A concept designed by Arab Creators, not a built project.

Arrival lobby Private Banking Centre, Riyadh · Interior concept
Client lounge Private Banking Centre, Riyadh · Interior concept
Advisor office Private Banking Centre, Riyadh · Interior concept
Private meeting room Private Banking Centre, Riyadh · Interior concept
VIP majlis Private Banking Centre, Riyadh · Interior concept
Corridor Private Banking Centre, Riyadh · Interior concept
Material detail Private Banking Centre, Riyadh · Interior concept
Material palette Private Banking Centre, Riyadh · Interior concept

Materials and details

  • Verde green marble walls and counters
  • Cream limestone floors and walls
  • Dark oak doors, screens and desks
  • Cognac leather seating
  • Polished brass lighting and trims
  • Acoustic fabric in meeting rooms

Design idea

A centre that gives clients privacy and confidence: a clear route from the lobby to the lounge and private rooms, without clients crossing paths. Green marble and brass give a refined banking character, while leather and oak add warmth.

Suggested spaces

A centre of about 300 to 800 m². Lobby, client lounge, relationship manager offices, private meeting rooms, a VIP majlis, a safe deposit room, back offices and services.

Build and upkeep

Banking centres need early coordination with security, CCTV and access control, and meeting rooms need high acoustic separation for confidentiality. Marble needs a sealer and leather a fire-rated specification.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Private banking film
Private banking reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: