Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptOffices and workspaces · Riyadh · 2026

Startup Office in Riyadh with Products Available in Saudi Arabia

Interior concept for a four-person startup office in Riyadh, designed entirely with products available in the Saudi market: IKEA furniture and Ultra Light lighting, with a shopping list of prices and links. Furniture and lighting total SAR 37,542 at retailer prices on 28 November 2026.

A concept designed by Arab Creators, not a built project.

Overview Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept
Workspace Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept
Meeting corner Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept
Storage Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept
Pantry Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept
Lighting Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept
Detail Startup Office in Riyadh with Products Available in Saudi Arabia · Interior concept

Materials and details

  • Ready-made IKEA Saudi furniture
  • Ultra Light lighting
  • Oak slat wall
  • Light grey vinyl flooring
  • White acoustic ceiling
  • Indoor planting

Design idea

We design an office that can be built straight away: every furniture and lighting item in the images is sold in Saudi showrooms at a published price, so what you see is what you buy. Finishes are simple and the space can grow with the company.

Shopping list

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Startup office film
Startup office reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: