Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptRetail · Riyadh · 2026

Luxury Oud and Perfume Boutique in Riyadh

Interior concept for an oud and perfume boutique in a Riyadh mall: a sales floor with a backlit onyx wall, a mall-facing storefront, a perfume blending bar, a private VIP lounge and a gift-wrap and checkout counter.

A concept designed by Arab Creators, not a built project.

Sales floor Luxury Oud and Perfume Boutique in Riyadh · Interior concept
Storefront Luxury Oud and Perfume Boutique in Riyadh · Interior concept
Blending bar Luxury Oud and Perfume Boutique in Riyadh · Interior concept
VIP lounge Luxury Oud and Perfume Boutique in Riyadh · Interior concept
Display wall Luxury Oud and Perfume Boutique in Riyadh · Interior concept
Gift-wrap counter Luxury Oud and Perfume Boutique in Riyadh · Interior concept
Detail Luxury Oud and Perfume Boutique in Riyadh · Interior concept
Material palette Luxury Oud and Perfume Boutique in Riyadh · Interior concept

Materials and details

  • Backlit honey onyx
  • Smoked oak
  • Brushed brass
  • Travertine
  • Cream plaster
  • Deep green velvet

Design idea

Perfume sells on feeling before scent. Backlit onyx gives a warm amber glow, bottles are displayed like jewellery on few shelves, and light is aimed at the product, not the room.

Store plan

A storefront that draws people in from the mall, an open sales floor, a blending bar in front of the customer, a private VIP lounge, and a gift-wrap and checkout counter at the end of the route.

Delivery in malls

We coordinate with mall management on storefront, lighting and fire-rated finish requirements, and prepare construction drawings and the BOQ before procurement.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Oud boutique film
Oud boutique reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: