Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptLuxury fit-out · Riyadh · 2026

Villa Master Suite in Riyadh

Interior concept for the master suite of a Riyadh villa: a bedroom with a fluted oak wall, a private lounge, a dressing room with a travertine island, and a master bathroom with a stone bathtub and walk-in shower.

A concept designed by Arab Creators, not a built project.

Bedroom Villa Master Suite in Riyadh · Interior concept
Private lounge Villa Master Suite in Riyadh · Interior concept
Dressing room Villa Master Suite in Riyadh · Interior concept
Master bathroom Villa Master Suite in Riyadh · Interior concept
Walk-in shower Villa Master Suite in Riyadh · Interior concept
Detail Villa Master Suite in Riyadh · Interior concept
Material palette Villa Master Suite in Riyadh · Interior concept

Materials and details

  • Warm travertine
  • Smoked oak
  • Ivory boucle fabric
  • Brushed bronze
  • Warm taupe plaster
  • Concealed linear lighting

Design idea

The master suite is a place of calm: earthy colours, natural materials you can feel, and warm concealed light instead of direct lighting. All storage is built into the walls to keep the space clean.

Suite plan

A bedroom facing the garden, a separate private lounge, a dressing room between bedroom and bathroom, and a master bathroom with a bathtub, walk-in shower, natural light and ventilation.

Locally available products

The mixer in the images is a slim cylindrical design. One option available in Saudi Arabia is the GROHE Essence M from Abyat at SAR 999 in gold or SAR 797 in chrome (website prices on 28 November 2026). The image is a general visualisation, not this specific product.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Master suite film
Master suite reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: