Interior conceptLuxury fit-out · Riyadh · 2026
Contemporary Najdi Majlis in a Riyadh Villa
Interior concept for the guest wing of a Riyadh villa in a contemporary Najdi language: a carved cypress entrance, a men's majlis with floor seating, a women's majlis, a dining room and a guest washroom.
A concept designed by Arab Creators, not a built project.
Materials and details
- White lime plaster
- Carved cypress wood
- Timber ceiling beams
- Travertine
- Brushed brass
- Hand-knotted rugs
Design idea
The majlis is the face of the house. We take the triangles, carving and timber beams of Najdi architecture and present them with calm lines and concealed lighting, so the space feels familiar to elders and comfortable for guests.
Guest wing plan
A separate guest entrance, a men's majlis, a women's majlis with its own entrance, a dining room between them served from the kitchen, and a guest washroom near the entrance.
Locally available products
The washroom mixer is a slim cylindrical single-lever design. One option available in Saudi Arabia is the GROHE Essence M in chrome from Abyat at SAR 797 (website price on 28 November 2026). The image is a general visualisation, not this specific product.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.
Build and upkeep
Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Engineering Consultancy Office in Riyadh
- Startup Office in Riyadh with Products Available in Saudi Arabia
- Luxury Car Showroom, Riyadh
- Private Banking Centre, Riyadh
- Tech Company Headquarters, Riyadh
- Family Office, Riyadh
- Real Estate Sales Gallery, Riyadh
- Law Firm Office, Riyadh
- Coworking Space, Riyadh
- Fine Dining Restaurant, Riyadh
- Executive Diwan, Riyadh
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
