Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptHospitality · Riyadh · 2026

Najd-Inspired Boutique Hotel in Riyadh

Interior concept for a boutique hotel in Riyadh with a warm identity drawn from the colours of Najd: a double-height lobby, a lounge with an Arabic coffee corner, a restaurant with a perforated terracotta wall, corridors, guest rooms and bathrooms.

A concept designed by Arab Creators, not a built project.

Lobby Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Lobby lounge Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Restaurant Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Corridor Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Guest room Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Bathroom Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Detail Najd-Inspired Boutique Hotel in Riyadh · Interior concept
Material palette Najd-Inspired Boutique Hotel in Riyadh · Interior concept

Materials and details

  • Limestone
  • Fluted bronze
  • Walnut
  • Terracotta tile
  • Patterned cream stone
  • Rust and sand velvet

Design idea

A small hotel with a clear identity: the clay and stone colours of Najd, warm materials and concealed light. Guests feel the place from the first step into the lobby to their room.

Operations before looks

We plan routes with the operator: service separated from guest circulation, storage close to the restaurant, and durable, easy-to-maintain materials, with Ministry of Tourism and Civil Defense requirements reviewed.

Rooms and bathrooms

A typical room repeated precisely on every floor, with standard joinery and finish details that simplify construction and control cost.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Boutique hotel film
Boutique hotel reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: