Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptEvents and halls · Riyadh · 2026

Luxury Wedding Hall in Riyadh

Interior concept for a luxury wedding hall in Riyadh: a ballroom with a raised runway and kosha, an entrance with a double staircase, a guest reception majlis, a bridal preparation suite and a buffet area.

A concept designed by Arab Creators, not a built project.

Ballroom Luxury Wedding Hall in Riyadh · Interior concept
Kosha Luxury Wedding Hall in Riyadh · Interior concept
Entrance Luxury Wedding Hall in Riyadh · Interior concept
Reception majlis Luxury Wedding Hall in Riyadh · Interior concept
Bridal suite Luxury Wedding Hall in Riyadh · Interior concept
Buffet area Luxury Wedding Hall in Riyadh · Interior concept
Detail Luxury Wedding Hall in Riyadh · Interior concept
Material palette Luxury Wedding Hall in Riyadh · Interior concept

Materials and details

  • Ivory marble
  • Champagne gold leaf
  • Ivory velvet
  • Crystal chandeliers
  • Plaster mouldings
  • Gold-framed mirrors

Design idea

The night of a lifetime needs a stage: a raised runway that leads the eye to the kosha, a gilded coffered ceiling that carries the chandeliers, and warm controllable lighting suited to the zaffa and photography.

Operations

Separate men's and women's sections with their own entrances, a service route from kitchen to buffet that does not cross guest circulation, a bridal suite close to the kosha, and sound and lighting control rooms.

Approvals and delivery

We review event hall and Civil Defense requirements (emergency exits, occupancy and fire-rated finishes), and prepare construction drawings and the BOQ.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Wedding hall film
Wedding hall reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: