Interior conceptFood and beverage · Riyadh · 2026
Specialty Coffee Roastery Cafe in Riyadh
Interior concept for a specialty coffee roastery cafe in Riyadh: a main hall with a long bar, a glazed roastery, a quiet lounge corner, an outdoor terrace and a street facade.
A concept designed by Arab Creators, not a built project.
Materials and details
- Pale terrazzo
- Sand fluted plaster
- Ash timber
- Earthen textured walls
- Olive and tan leather
- Travertine
Design idea
A specialty cafe sells the experience: the roastery is on show behind glass, the bar is an open stage for the barista, and earthy materials echo the colours of Riyadh. Seating ranges from work tables to quiet corners.
Operations
We plan the bar around ordering, preparation and hand-off, provide ventilation and exhaust for the roaster, water, drainage and power for equipment, and storage for beans and milk, with municipal and Civil Defense requirements.
Outdoor seating
A shaded terrace with a timber pergola and planting, in materials that cope with heat and dust, and evening lighting that extends trading hours.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.
Build and upkeep
Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Premium Fitness Club in Riyadh
- Luxury Oud and Perfume Boutique in Riyadh
- Najd-Inspired Boutique Hotel in Riyadh
- Villa Master Suite in Riyadh
- Dental Clinic in Riyadh
- Contemporary Najdi Majlis in a Riyadh Villa
- Engineering Consultancy Office in Riyadh
- Startup Office in Riyadh with Products Available in Saudi Arabia
- Luxury Car Showroom, Riyadh
- Private Banking Centre, Riyadh
- Tech Company Headquarters, Riyadh
- Family Office, Riyadh
- Real Estate Sales Gallery, Riyadh
- Law Firm Office, Riyadh
- Coworking Space, Riyadh
- Fine Dining Restaurant, Riyadh
- Executive Diwan, Riyadh
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
