Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Interior conceptLuxury residential · Riyadh · 2026

Luxury Residential Tower Amenities in Riyadh

Interior concept for the shared areas of a luxury residential tower in Riyadh: a triple-height lobby, a residents lounge, a lift lobby, an indoor pool overlooking the city, a gym and residential corridors.

A concept designed by Arab Creators, not a built project.

Lobby Luxury Residential Tower Amenities in Riyadh · Interior concept
Residents lounge Luxury Residential Tower Amenities in Riyadh · Interior concept
Lift lobby Luxury Residential Tower Amenities in Riyadh · Interior concept
Indoor pool Luxury Residential Tower Amenities in Riyadh · Interior concept
Gym Luxury Residential Tower Amenities in Riyadh · Interior concept
Corridor Luxury Residential Tower Amenities in Riyadh · Interior concept
Detail Luxury Residential Tower Amenities in Riyadh · Interior concept
Material palette Luxury Residential Tower Amenities in Riyadh · Interior concept

Materials and details

  • Book-matched marble
  • Fluted bronze
  • Honed travertine
  • Walnut
  • Ivory boucle
  • Taupe leather

Design idea

Shared areas are the first thing buyers and residents see, and they set the value of a unit before anyone enters it. We use a few luxurious materials, generous heights and indirect lighting for a hotel feel.

For developers

We design shared areas to raise sales value and simplify operations: materials that withstand daily traffic, clear routes for residents and service, and coordination with MEP, lifts and pool works.

Delivery

Construction drawings and details for marble and bronze, a BOQ, and follow-up on sample submittals and approvals before installation.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Residential tower film
Residential tower reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: