Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptPrivate retreats · Riyadh · 2026

Contemporary Family Istiraha in Riyadh

Concept for a family istiraha (weekend retreat) in Riyadh in a contemporary Najdi language: an outdoor majlis under a pergola around a fire pit, a pool, an indoor majlis with Najdi niches, a barbecue area, a garden with a small pitch and a timber-gated entrance.

A concept designed by Arab Creators, not a built project.

Outdoor majlis Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Pool Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Indoor majlis Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Barbecue Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Garden Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Entrance Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Detail Contemporary Family Istiraha in Riyadh · Architecture and interior concept
Material palette Contemporary Family Istiraha in Riyadh · Architecture and interior concept

Materials and details

  • Textured mud plaster
  • Weathered timber
  • Black steel
  • Terracotta tile
  • Sand canvas shades
  • Travertine

Design idea

The istiraha is where family and friends gather at the weekend. We bring the outdoor fire-pit majlis, the pool, the barbecue and the indoor majlis into one composition, in materials that echo the Najdi setting and cope with heat and dust.

Planning and privacy

A separate guest entrance, family areas separated from the men's majlis, a pitch and play area within sight of the seating, and enough shade in every outdoor zone.

Delivery

Architectural and structural drawings and permits, pool, irrigation and outdoor lighting design, a BOQ, and full delivery from design to handover.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Istiraha film
Istiraha reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: